What is a Traffic Impact Study?

What is a Traffic Impact Study?

DNS Engineering

What Is a Traffic Impact Study? A Plain-Language Guide for Canadian Developers and Property Owners

If you are planning a new building, expanding an existing one, or applying for a rezoning or minor variance, there is a good chance someone at city hall will ask for a traffic impact study before they sign off. For many applicants, this is the first time they have heard the term - and it often arrives with a deadline and a budget question attached.

This guide explains what a traffic impact study actually is, when municipalities require one, what goes into it, and what it means if your project is small.

The short version

A traffic impact study (TIS), also called a transportation impact study or transportation impact assessment (TIA), is a technical report that estimates how much new traffic (vehicular and non-vehicular) your development will generate and how that traffic will affect the surrounding road network. It is prepared by a professional engineer and submitted to the road authority - usually a municipality, region, or province - as part of your planning approval.

The purpose is simple to state and harder to satisfy: demonstrate that the public road network can safely and reasonably absorb the trips your project creates, and identify any improvements needed to make that true. Those improvements might be a new turn lane, a signal, better sight lines at your driveway, or sidewalk and cycling connections.

Why “in Canada” matters

Traffic studies follow a broadly similar logic everywhere, but the standards your engineer must cite are specifically Canadian. The national reference is the Transportation Association of Canada (TAC), whose Geometric Design Guide for Canadian Roads sets out the design standards for access points, turn lanes, sight distances, and intersection spacing that most municipalities require studies to conform to.

On top of TAC, expect a layer of provincial standards. In Ontario, that means the Ministry of Transportation’s geometric design standards and the Ontario Traffic Manuals. Alberta has its own provincial TIA guidelines, British Columbia has its pedestrian and crossing manuals, and so on. Then there is a third layer: the municipality or region itself. Places like Peel, Niagara, Ottawa, Toronto, and Vancouver each publish their own terms of reference dictating study area, peak periods, software, and report format.

The practical takeaway is that there is no single national template. Two similar projects in two different jurisdictions can face different triggers and different scopes. The first move on any project is to confirm requirements with the actual road authority that has jurisdiction over the affected roads.

When do you actually need one?

The most commonly cited rule of thumb across North America is that a study is required when a development is expected to generate roughly 100 or more new vehicle trips during the peak hour of adjacent road traffic. Many Canadian municipalities use a number in that range as their trigger.

That figure is a guideline, not gospel. Urban and transit-oriented jurisdictions - Toronto, Montreal and Vancouver being frequent examples - take a more context-sensitive approach and may require analysis at lower trip volumes if the site sits near a sensitive intersection, a school, a transit hub, or an area already experiencing congestion. Conversely, a project below the threshold in a quiet area may need nothing at all.

Trip estimates themselves come from the Institute of Transportation Engineers (ITE) Trip Generation Manual, the industry-standard dataset that assigns trip rates to dozens of land use types. An engineer matches your proposed use - apartments, retail floor area, office space, a drive-through - to the relevant ITE land use code and calculates expected trips from the size of your project.

What about minor variations and small projects?

This is the question that matters most to owners making a modest change, and the good news is that “you need a traffic study” is rarely the whole story.

Municipalities generally apply a tiered approach. A large subdivision or commercial centre triggers a full study. A mid-sized project might warrant an abbreviated assessment. And a small project - a minor variance, a change of use, an addition that adds only a handful of peak-hour trips - frequently needs only a short traffic brief or traffic statement letter, sometimes just a page or two prepared by an engineer confirming that the change is below the threshold and will not materially affect the network.

In some cases, the requirement can be waived entirely once the road authority is satisfied the impact is negligible. The key is that someone qualified documents why the impact is minor, rather than simply asserting it. A short, well-reasoned letter from an engineer at the pre-application stage often costs far less than the delay of having an incomplete submission bounced back.

So if you are an owner adding a modest unit or changing how an existing building is used, do not assume you are facing a five-figure study. Ask the municipality early what tier applies to you.

Common outcomes

A study does not automatically mean expensive roadwork. Typical recommendations, from least to most involved, include adjusting signal timing, adding auxiliary turn lanes at your access, improving driveway sight lines, upgrading or relocating an access point, contributing to a future signal or roundabout, or enhancing sidewalk and bike connections. Sometimes the most cost-effective recommendation is to slightly resize or reconfigure the project itself to drop below a threshold.

How to set yourself up well

A few habits save applicants real time and money:

  • Ask first, build the proposal second. A pre-consultation with the road authority tells you which tier you are in before you commit to a scope.
  • Engage an engineer early. Trip estimates done at the concept stage can flag access or capacity issues while the site plan is still flexible and cheap to change.
  • Confirm jurisdiction. A single site can front a municipal road and a regional or provincial one, each with its own requirements. Identify every road authority involved.
  • Keep your land use details handy. Floor areas, unit counts, hours of operation, and phasing all feed directly into the trip calculation, so accurate numbers up front mean fewer revisions later.

The bottom line

A traffic impact study is the bridge between your development concept and the public infrastructure it relies on. For large projects it is a substantial piece of engineering; for minor variations it may be a brief letter or nothing at all. Either way, the determining factors are the same - how many trips you generate, where they go, and what the road network can handle.

The single most valuable thing you can do is ask the right question early: given my project and my jurisdiction, what level of traffic analysis do I actually need? Getting a clear answer at the outset keeps your approval on schedule and your budget intact, which is what we specialize in doing here at DNS.


This article is general information, not engineering or legal advice. Requirements vary by municipality, region, and province. Confirm the specific terms of reference with the road authority that has jurisdiction over your site.